Fast track applications
Fast track is a service offered, where we have your application checked within 10 working days.
If we do not meet this 10 day period, we will refund the difference in cost.
This service is only offered on table 2 works and associated Table 3 works on the same application for full plans applications only.
Table 2: Charges for extensions, garage conversions and loft conversions
Separate extensions constructed at the same time may be aggregated together.
Type of work | Total fee | Total fee for fast track |
---|---|---|
Detached non-habitable building having a floor area not exceeding 40m2 in total. | £591 | £651 |
Garage conversions where the total floor area does not exceed 30m2 including means of access and work in connection with that extension. | £591 | £651 |
Any extension of loft conversion where the total floor area of which does not exceed 30m2 including means of access and work in connection with that extension. | £754 | £830 |
Any extension or loft conversion where the total floor area of which exceeds 30m2, but does not exceed 60m2 including means of access and work in connection with that extension. | £1,039 | £1,143 |
Any extension or loft conversion where the total floor area of which exceeds 60m2, but does not exceed 100m2 including means of access and work in connection with that extension. | £1,234 | £1,358 |
Table 2: Loft conversion
For the purpose of calculating charges a reference to an extension includes a room or rooms in the roof space (including access) of an existing building not exceeding three storeys in height.
Where work comprises more than one extension which is to be constructed at the same time (including rooms in roofs and associated access in buildings of three storeys or less) the total internal floor areas of all storey of all the extensions shown may be added together to determine the relevant charge.
If the extension(s) exceed 100m2 or 3 storey’s in height then Table 3 applies.
All work contained within the foot print of an extension or loft conversion is included in the fee but does not include works outside of the footprint of the extension or loft conversion.
For additional internal or external alterations Table 3 should be used.
For multiple work that is to be carried out at the same time and falls into Table 3 as well as Table 2, the Table 3 fee may be discounted by 25 percent.